Home page  
Home   Your Room   Login   Contact   Feedback   Site Map   Search:  
Discover this product  
About Us
Overview
Getting here
Committees
Products
Forecasts
Order Data
Order Software
Services
Computing
Archive
PrepIFS
Research
Modelling
Reanalysis
Seasonal
Publications
Newsletters
Manuals
Library
News&Events
Calendar
Employment
Open Tenders
   
Home > Services > Dissemination > 3.1 > Meteorological Bulletin M3.1 > Wave Ensemble Forecast > 
 Event Probability products Boundary Condition Optional Project  
   

Transmission of Products

Browse
Dissemination products
Dissemination requirements
Control, Perturbed and Calibration/Validation forecast products
Event Probability products
Transmission of Products
 
 

Each day the operational medium-range forecast runs first, followed as soon as possible by the EPS.

 

The dissemination filename convention used for the transmission of Wave EPS products is described in Section 12. Data stream indicator for the wave ensemble control and perturbed forecast products in dissemination file names is `W'. Products, other then control and perturbed wave ensemble forecasts are disseminated in a dissemination file having data stream indicator `U'.

 

Wave EPS products are prepared separately from other dissemination products. Control and perturbed forecast products are transmitted together as one file per a time step. All derived Wave EPS data products (other then control and perturbed forecast) are disseminated in two dissemination files. One file, valid at D+10 contains products for all time step ranges T+0 to T+240 and the other file, valid at D+15 contains products for all time step ranges from T+246 to T+360. Availability of Wave EPS products is shown in the table below. Forecast time steps not listed in the table are disseminated at regular intervals between the times shown.

 

12 UTC based

Forecast time

Time Available

 

00 UTC based

Forecast time

Time Available

 

Forecast Step 0

Forecast Day 10

Forecast Day 15

Derived products 0 to D+10

Derived products D+11-D+15

19:40

20:20

20:40

20:21

20:41

Forecast Step 0

Forecast Day 10

Forecast Day 15

Derived products to Day 10

Derived products D+11-D+15

7:40

8:20

8:40

8:21

8:41

 

Default transmission priority for Wave EPS products is 50.




Top of page 18-01-2011
 
   Compare Pages Page Details         © ECMWF
 Event Probability products Boundary Condition Optional Project  
shim shim shim