|
IFS Documentation front page
I Observations
II Assimilation
III Dynamics
IV Physics
V Ensemble
VI Technical
VII Waves
|
|
4.3 Performance
The following performance figures relate specifically to the operational version of the model run at horizontal resolution T213 with 31 levels on the 16-processor Cray Y-MP C90. With the model time-step set at 15 minutes the total CPU time per forecast day would be about 1.5 hours on a single processor, the corresponding elapsed time (excluding the post-processing) being 7 minutes when the work is shared amongst 16 processors. This represents a sustained computation speed of about 3.5 gigaflops floating-point operations per second). The memory requirements are 49 Mwords of central memory plus 70 Mwords of secondary storage. Multitasking using 16 processors provides a speed-up factor of 13 compared with using a single processor. A typical operational 10-day forecast, including all the post-processing, takes 2 hours of elapsed time.
|